Description: "The year 2035 regional land use plan incorporates the basic principles and concepts of the previously adopted
plans. The plan promotes a compact, centralized regional settlement pattern, with urban development
recommended to occur within, and along the periphery of, existing urban centers; promotes the location of new
urban development in areas which are physically suitable for such development and which may be readily
served by basic urban services, including sanitary sewer, water supply, and public transit services; and seeks to
preserve the environmentally sensitive lands and the most productive farmlands in the Region. Like the
previous plans, the new plan is advisory in nature. Plan implementation will depend largely upon the
willingness of county and local governments to use land use controls to shape development patterns in the
regional interest.
The year 2035 regional land use plan will provide a sound regional development framework needed in support
of transportation and other public facility planning at the regional level, and in support of the preparation of
comprehensive plans and related plan implementation efforts by county and local units of government in the
Region. "
http://www.sewrpc.org/SEWRPCFiles/Publications/pr/pr-048_regional_land_use_plan_for_se_wi_2035.pdf
Service Item Id: 827a9d97faf141e8a718306dcf5b12f5
Copyright Text: Southeastern Wisconsin Regional Planning Commission, Racine County
Value: Other Agricultural, Rural Residential, and Open Land with Easements Label: Other Agricultural, Rural Residential, and Open Land with Easements Description: Symbol:
Value: Secondary Environmental Corridor (Sewer Service Area Plan) Label: Secondary Environmental Corridor (Sewer Service Area Plan) Description: Symbol:
Value: Surface Water from Planned Isolated Natural Resouce Area (Sewer Service Area Plan) Label: Surface Water from Planned Isolated Natural Resouce Area (Sewer Service Area Plan) Description: Symbol: